1. Home
  2. Docs
  3. 3018 X-Axis Rigidity Upgrade
  4. Assembly
  5. Step 7 – New Linear Rails

Step 7 – New Linear Rails

Install the new 12mm diameter linear rails to the right size (stepper motor side) of the X-axis gantry. Install these loosely as you’ll need to later align them once the X/Z carriage is installed. Note: New M5 x 20 screws and washers have been provided with your upgrade kit. Use the new M5 hardware with 1 M5 washer placed under each X-axis rail screw head.

Was this article helpful to you? Yes 1 No

How can we help?